The backhoe dredger SEEM 39-970ST « Benchicao » has been laucnhed. In several months, she will be delivered to her new owner.
Month: June 2016
Merré and Mecasoud build a 39 meters long hull
Mecasoud works as a subcontractor for the Merré shipyard on the steel hull of a 39 meters bakchoe dredger.